Project Timeline Calculator

Plan tasks with FS, SS, FF and SF dependencies and lag in working days; get the end date, slack, critical path, Gantt chart and CSV. How it works

Use the Project Timeline Calculator

working days
Dependencies:

No dependencies (starts at project start)

working days
Dependencies:
Lag:
working days
Dependencies:
Lag:
Project End
Add tasks and set a start date
Calendar days — · Working days —
Select a start date to generate a timeline

About the Project Timeline Calculator

The project end comes from a forward pass over working days. The default plan, Task A (5 days), then Task B (10) and Task C (3), each starting after the one before, begins Monday, October 19, 2026 and ends Wednesday, November 11, 2026: 18 working days, 24 calendar days, with all three tasks on the critical path and 0 slack. Each task can depend on others by finish-to-start, start-to-start, finish-to-finish or start-to-finish links with a lag in working days.

The default plan, starting Monday, October 19, 2026

TaskDurationStartEndSlack (working days)Critical
Task A5Mon Oct 19, 2026Fri Oct 23, 20260Yes
Task B (after A)10Mon Oct 26, 2026Fri Nov 6, 20260Yes
Task C (after B)3Mon Nov 9, 2026Wed Nov 11, 20260Yes

Five-day week. The project has 18 working days and 24 calendar days, and Task C ends on day 18.

How a link moves the second task: X lasts 5 days, Y lasts 3, both start from Monday, October 19, 2026

Link from X to YY startsY ends
Finish-to-start, lag 0Mon Oct 26, 2026Wed Oct 28, 2026
Finish-to-start, lag 2Wed Oct 28, 2026Fri Oct 30, 2026
Finish-to-start, lag −2Thu Oct 22, 2026Mon Oct 26, 2026
Start-to-start, lag 0Mon Oct 19, 2026Wed Oct 21, 2026
Start-to-start, lag 2Wed Oct 21, 2026Fri Oct 23, 2026
Finish-to-finish, lag 0Wed Oct 21, 2026Fri Oct 23, 2026
Finish-to-finish, lag 2Fri Oct 23, 2026Tue Oct 27, 2026

Lag counts working days; a negative lag is a lead. Work cannot start before the project start date.

Slack: Design (5 days) and Copy (2 days) both feed Launch (3 days)

TaskStartEndSlack (working days)Critical
DesignMon Oct 19, 2026Fri Oct 23, 20260Yes
CopyMon Oct 19, 2026Tue Oct 20, 20263No
Launch (after both)Mon Oct 26, 2026Wed Oct 28, 20260Yes

Copy can slip by 3 working days (to Fri Oct 23) before Launch is delayed.

How to use this tool

  1. Enter the project name and start date, and choose the working days per week (1 to 7, counted from Monday).
  2. Add tasks (up to 50) with a duration in working days, from 0.25 to 365 in steps of 0.25, or tick Milestone for a task with no duration.
  3. Link tasks: pick a predecessor, a type (FS, SS, FF or SF) and a lag from −30 to 30 working days.
  4. Read the end date, calendar and working days, the critical path, each task’s slack and the Gantt chart, then copy a share link or export a CSV. Tick Show all dates to add each task’s latest start and latest finish.

Frequently asked questions

How do I find the critical path of a project?
Read the Critical Path line above the Gantt chart, or the Critical column of the task table: in the default plan it is Task A → Task B → Task C. A day lost on any of those tasks moves the end date by a day. To finish sooner, shorten a critical task or let two of them overlap with a start-to-start link; shortening a task that has slack changes nothing.
What is slack (float) and how is it counted here?
Slack is how many working days a task can slip before the end date moves. In the Design, Copy and Launch example, Copy has 3 working days of slack: it can finish as late as Friday, October 23 instead of Tuesday, October 20. A task that slips by more than its slack becomes critical and pushes the end date out by the difference. Tick Show all dates to see the limits as dates: Copy’s latest start is Thursday, October 22 and its latest finish Friday, October 23.
What do FS, SS, FF and SF mean?
Finish-to-start (FS): the next task starts on the working day after the previous one finishes. Start-to-start (SS): it starts when the previous one starts. Finish-to-finish (FF): it finishes when the previous one finishes. Start-to-finish (SF): it finishes when the previous one starts. A lag in working days delays the link and a negative lag brings it forward.
Why does the default plan take 18 working days but 24 calendar days?
The tasks add up to 5 + 10 + 3 = 18 working days, and the calendar runs from Monday, October 19 to Wednesday, November 11, 2026. Those 24 days include 6 weekend days that carry no work. With a 7-day week the same plan ends on Thursday, November 5 after 18 calendar days.
Can a task last a fraction of a day?
Yes, in quarter days: the duration goes up in steps of 0.25 from 0.25 to 365. A 0.25-day task still occupies one working day on the calendar, so a plan with only that task shows 1 working day.
Can I share or export the plan?
Share Timeline copies a link that holds the project name, start date, working days and tasks, including names with commas. Export CSV writes the tasks with Duration (working days) and Slack (working days) columns, plus Latest start and Latest finish when Show all dates is ticked. Recent projects are listed in this browser.